Seamless Tube, Precision Seamless Tube, Precision Mechanical tube, Fluid Pipe, Hydraulic oiled Pipe, Pneumatic tube, Finned Tube, U-tube......
 
Company's News Pipe&Tube Tech Info Steel Industry Tech Info
Login
   
Category
 
Company's News  (13)
Pipe&Tube Tech Info  (870)
Steel Industry Tech Info  (83)
 
Latest article
 
 
Temper
Tiancheng Group_Steel-Tube.com   2008-03-04 21:37:08 Author:Josen Dong Source: Font size:[Large][Middle][Small]

Temper

Temper is a measure of a metal's resistance to bending or kinking. It does not refer to how hard the metal is. Low temper, such as H-1 (also referred to as "1/8 Hard"), indicates a tendency to bend or kink permanently when subjected to very little force. High temper, such as H-8 or "Full Hard", indicates a tendency to spring back upon bending.

   F temper (as fabricated tempers)
   This letter indicates that there has been no effort to control the temper of the material - you receive it "as is".

   O temper (annealed temper)
    Annealing is a process of heating up metal past a critical tempurature whereby the material is relieved of the internal stresses from production or             fabrication. It is the lowest temper available (the most easily bent).

   W temper (solution heat treated temper)
   This letter refers to metal that has undergone a specific procedure to produce a temper for a particular batch of metal in order to comply with some specific need of the customer.

  H tempers (strain-hardened tempers)
  This letter designates a process of stretching or compressing in order to impart a particular temper.
     H_1    1/8 hard
     H_2    1/4 hard
     H_3    3/8 hard
     H_4    1/2 hard
     H_5    5/8 hard
     H_6    3/4 hard
     H_7    7/8 hard
     H_8    Full hard

  T tempers (thermally treated tempers)
   These tempers are imparted by heating, quenching, or cooling in a controlled way.
    T1    Cooled after being shaped to its final dimensions during a process involving a lot of heat (such as extrusion), then naturally aged to a stable condition.
    T2    Cooled after being shaped to its final dimensions during a process involving a lot of heat (such as extrusion), then cold worked.
    T3    Solution heat treated, cold worked and naturally aged to a stable condition.
    T4    Solution heat treated and naturally aged to a stable condition
    T5    Cooled after being shaped to its final dimensions during a process involving a lot of heat (such as extrusion), then artificially aged. T5 is T1 that has been artificially aged.
    T6    Solution heat treated and artificially aged to a stable condition. T6 is T4 that has been artificially aged.
    T7    Solution heat treated and naturally aged past the point of a stable condition. This process provides control of some special characteristics.
    T8    Solution heat treated, cold worked and artificially aged. T8 is T3 that has been artificially aged.
    T9    Solution heat treated, artificially aged and cold worked A stable temper T9 is T6 that has been cold worked.
    T10    Cooled after being shaped to its final dimensions during a process involving a lot of heat (such as extrusion), then cold worked and artificially aged. T10 is T2 that has been artificially aged.

Latest comments


If you want to Contact Us pls click here!

 
If you want to know if we can provide these products, please click here.
Release comments
Title
Message
Smilies
 

DIN2391 Tube EN10305 Tube Jiangsu China Changzhou China GB/T 3639 Tube Cooperation Links Cooperation Links ASTM A179 ASME SA179 常州精密钢管博客

苏ICP备08003692号   Copyright  1989-2011